![]() |
|
#11
|
|||
|
|||
|
[ QUOTE ]
P.48: <B,call> = p(A has nuts)(-1) + p(A has a bluff)(+5) <B,call> = (0.2)(-1) + (5)x Shouldn't it be: <B,call> = p(A has nuts)(-1) + p(A has a bluff)(+5) <B,call> = (1-x)(-1) + (5)x [/ QUOTE ] There is a problem in the original text. The correct formulation follows from conditioning on the right information set. I previously posted the correction here: http://forumserver.twoplustwo.com/sh...age=0&vc=1 The authors' general conclusions are unchanged by the correction even though the value function (and graph thereof) becomes non-linear. |
|
|